What files do I need to submit for a PCBA project?
Send Gerber files, a BOM with manufacturer part numbers, the pick-and-place (centroid) file and assembly drawings. If you need IC programming or functional testing, include firmware and test procedures. Our engineers complete a DFM and BOM review before production starts.
Is there a minimum order quantity (MOQ)?
No. STHL accepts prototype, low-volume and high-volume PCB assembly orders, so you can validate a design and scale to mass production with the same supplier. This is useful for Bangladesh industrial control pilots where field validation may happen before larger rollout.
Can STHL source all the electronic components?
Yes. We offer full turnkey, partial turnkey and consigned assembly. Our sourcing team works with 100+ agents and suppliers covering more than 500,000 part numbers, with incoming inspection and traceability from reel to finished board.
Which quality certifications does STHL hold?
STHL is certified to IATF 16949, ISO 9001, ISO 14001 and ISO 13485, and produces RoHS-compliant assemblies. Boards are verified with AOI, X-ray, ICT and functional testing as required by the product and project plan.
How do you protect our design files and IP?
We sign an NDA before RFQ, restrict project data to the assigned engineering team and track every build through our ERP and MES systems. Access to Gerber, BOM, firmware and test files is controlled for the project.
Can we audit or visit the factory?
Yes. Customers are welcome to visit our Shenzhen factory and R&D laboratory at any time, and a 360-degree virtual factory tour is available for remote evaluation. Bangladesh procurement teams can combine a video review, document review and on-site visit.
How does STHL support Bangladesh-specific risks such as humidity, heat and unstable power?
For industrial control PCB Assembly, we discuss conformal coating, thermal via and copper-balance review, derating, connector strain relief, surge-protection recommendations and wide-temperature component selection. These measures are matched to the enclosure, installation location and product standard. They are engineering controls, not a substitute for the customer’s own product validation.
What shipping and documentation support is available for Bangladesh?
STHL supports export packing, labelling, traceability records, inspection reports and standard commercial documentation. Final customs classification and import compliance should be confirmed with the Bangladesh importer’s customs broker. ESD-safe packaging and moisture-barrier packing can be specified for sensitive assemblies.
Can STHL support low-volume industrial control pilot builds before mass production?
Yes. STHL is structured for high-mix, low-volume and prototype industrial control PCBA, with no MOQ. A pilot build can validate panelization, test coverage, conformal coating, packaging and installation feedback before volume release.
How do we qualify a China PCBA factory without a physical visit?
Start with NDA, certificate review, capability questionnaire, DFM feedback, a paid prototype build and inspection records. Ask for AOI/X-ray/functional test data where applicable, traceability samples and packaging photos. STHL also supports a 360° virtual factory tour and live video review for remote pre-qualification.
What is the typical lead time for industrial control PCBA?
Lead time depends on PCB complexity, component availability, coating, programming and test requirements. Prototype and low-volume builds usually move faster than volume projects with long-lead parts. The quotation should separate engineering review, material lead time, fabrication, assembly, testing and shipping so Bangladesh buyers can plan installation and service teams realistically.
Can STHL help with explosion-proof or hazardous-area products?
STHL can support manufacturing discipline, traceability, conformal coating and documentation for customer-designed electronics used in robust industrial environments. Hazardous-area certification and explosion-protection approval must be led by the product owner with the appropriate certification bodies. STHL does not replace that certification process.